CRS will reach today for the final test of Jhansi-Babina rail line
Jhansi. The Commissioner of Railway Safety (CRS) will reach here on Wednesday for the final test of the Jhansi-Babina section. After getting their green signal after testing, this track will be opened for normal traffic. With the introduction of this track, the speed of trains between Bina and Mathura will increase. According to Public Relations Officer Manoj Kumar Singh, about 25.35 km long third railway line between Jhansi-Bina railway line has been laid between Jhansi to Babina. On Wednesday, the Commissioner of Railway Safety, Northeast Circle, Mohd. Lateef Khan will reach here for its testing. During this, its strength will be tested by running the trial train at full speed on the newly constructed track. Apart from this, the bridge, track signal, installation and wiring under the section will also be tested. In view of the testing of the track, the PRO has asked the general public, including cattle, to stay away from the test site itself. With the introduction of this route, not only will the way for the operation of new trains be cleared, but time will also be saved in the operation of trains. The operation of trains will also be better.