Jhansi: Betwa been in operation for filling the pond thousand’s liters of water from the main canal burst fields filled. On receiving the information, preventing the operation of canal irrigation department began repairs. The canal by the contractor to stop the flow of water is torn by increasing the velocity of the water.
To quench the thirst of animals roaming the open ponds are filled by the irrigation department. It operates from May 12 Betwa main canal was started. The canal towards Hamirpur and Kutund area is run in two parts. Kutund told that the discipline of the work of canal lining were made by the contractor. Canal Walk was having trouble at work, in view of the irrigation department without informing the contractor of the bridge near the village canal water was stopped. About 500 Cusecs has suddenly increased the velocity of the water capacity of the race, which was Chapaar village near the canal burst and water started filling in the fields. Irrigation department to get information canal until it bursts, then idle thousand’s liters of water has flowed. The department was quick repairs, preventing the operation of the canal was started. Superintending Engineer SC Sharma has started operations by making repairs to the canal.